Travel between Mumbai’s two international airports is set to become significantly faster after the Maharashtra Government approved the construction of Mumbai Metro’s Line 8, popularly known as the Gold Line. The new corridor will directly connect Mumbai’s existing airport with the upcoming Navi Mumbai International Airport, reducing travel time to just 30–35 minutes.
The decision was taken at a Cabinet meeting chaired by Chief Minister Devendra Fadnavis, who instructed officials to secure all required clearances in advance and ensure timely execution. The project is aimed at strengthening Mumbai’s urban transport network while supporting growing air traffic demand.
Mumbai Metro Line 8 will create a seamless rail link between Chhatrapati Shivaji Maharaj International Airport (CSMIA) and the upcoming Navi Mumbai International Airport (NMIA).
The 35-km-long metro line will feature 20 stations, enhancing connectivity between key commercial and residential hubs.
Out of the 20 stations, six will be underground and 14 elevated. The underground stretch will run from Terminal 2 of the Mumbai airport to Ghatkopar East, while the elevated section will extend from Ghatkopar West to NMIA’s Terminal 2.
The average inter-station distance will be less than 2 km, ensuring better accessibility for commuters.
Once completed, the Gold Line is expected to reduce road congestion, shorten airport transfer times, and provide a reliable alternative to road transport, positioning Mumbai as a more efficient global aviation and transit hub.

